We’ve had lots of members of the team and some key suppliers, these are listed below, unfortunately not all have lived up to our expectations so we’ve terminated them. Hindsight is a wonderful thing …

David & Leah
Designed the house for planning, but gradually the relationship failed for a variety of reasons but their lack of knowledge of build systems and cost optimisation was the main ones.

Marc and John
The sister company of Green Roof Structures, and managed to find a solution avoiding piling, designed foundations, drainage, structural walls. Marc has been a pragmatic engineer really understanding what we need

Phil, Liam and Jack
We included a MEP consultant early in the process to create thermal models, and support Part O and Part L (EPC) work. Continuous errors and lack of attention to detail meant we let them go early ..

Ross and Marc
Our turn-key main Contractor and the Timber Frame Manufacturer. Ross is running the show and support by Marc (SHED). Creating something bespoke for us and understand what we want

Shaun and Steve
Local Amble company who has designed, built and will install the Kitchen and have sourced all the Bathroom furniture and fittings. Steve has been great and is a regular at Brewis Tap Room. The owner Shaun lives just up the road so we can always find him if there are problems ahead!

Uk based radiator company; low heat radiators (see more here) and also innovative bathroom towel radiators.

Ground Workers

Ecohaus Internorm
We’ve gone for Internorm Windows and Doors throughout supplied and fitted by Ecohaus.
All windows and sliding doors are Alu-uPVC, triple glazed. These will be fitted soon !
